🔔科技频道[奇诺分享-ccino.org]⚡️
5 小时前
❤️
每天收集喜欢的开源项目
iliyami/MacSai: Mac Sai:开源的 Mac 清理器、优化器和恶意软件扫描器。一个免费的、苹果认证的 CleanMyMac 替代品
GitHub
GitHub - iliyami/MacSai: Mac Sai: the open-source Mac cleaner, optimizer, and malware scanner. A free, Apple-notarized alternative…
Mac Sai: the open-source Mac cleaner, optimizer, and malware scanner. A free, Apple-notarized alternative to CleanMyMac, built with Swift 6 and SwiftUI. - iliyami/MacSai
Home
Blog
Discuss
Gsearch
Powered by
BroadcastChannel
&
Sepia